Bauer Technologies was awarded the £3.5m sub-contract by Ferrovial Lagan JV (FLJV) to install the foundation piles for a number of structures along the new motorway including foundation piles for the Braehead Railway Bridge.
All works had to be planned in detail, in close cooperation with FLJV and Network Rail, to ensure minimum disruption to rail services.
Bauer Technologies’ experience of previous work on similar projects carried out in a rail environment was fundamental to Bauer installing piles in less than 50% of the allowed construction time.